{"id":5828,"date":"2012-05-08T14:00:00","date_gmt":"2012-05-08T14:00:00","guid":{"rendered":"https:\/\/windar-renovables.com\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/"},"modified":"2021-07-05T14:03:59","modified_gmt":"2021-07-05T14:03:59","slug":"the-offshore-wind-farm-first-tower-to-be-built-in-aviles","status":"publish","type":"post","link":"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/","title":{"rendered":"The offshore wind farm first tower to be built in Avil\u00e9s"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><p class=\"p1\"><strong>Windar&#8217;s plant in Avil\u00e9s will manufacture the offshore wind farm first tower to be built in Spain. This was announced yesterday by Gamesa in a press release confirming that the Muelle de Arinaga, in Gran Canaria, will host the first prototype of these wind farms. Assembly will begin in the second quarter of 2013, with installation to be completed during the year, according to the multinational.<\/strong><\/p><\/p>\n\n<p class=\"wp-block-paragraph\">In this way, Windar renovables&#8217; facilities at the Parque Empresarial Principado de Asturias (PEPA) remain a major player in the offshore wind tower manufacturing sector, which is booming. Its proximity to the port of Avil\u00e9s is an important asset, as evidenced last February, when the first structure for an offshore wind power plant was built for installation in the North Sea.&#13;\n<\/p>\n\n<p class=\"wp-block-paragraph\">Gamesa yesterday highlighted the importance of the construction of the first offshore wind farm in Spain. The prototype will have a nominal power of 5 megawatts and a rotor diameter of 128 metres. The selection of the Canary Islands will allow the manufacture of all parts to be carried out in Spain.&#13;\n<\/p>\n\n<p class=\"wp-block-paragraph\">A world leader in the construction of conventional wind towers, Gamesa also wants to maintain this position in the offshore wind tower sector, which is currently undergoing rapid expansion. Thus, in the company note, it confirms that it is negotiating with the port of Leith, in Scotland, the conditions for establishing an industrial base to serve this market in the United Kingdom. This site would have two plants, one for the blades and the other for the nacelles, the metal structures which cover the rotor, as well as logistics activities.&#13;\n<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>LA VOZ DE AVIL\u00c9S<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Windar&#8217;s plant in Avil\u00e9s will manufacture the offshore wind farm first tower to be built in Spain. This was announced yesterday by Gamesa in a press release confirming that the Muelle de Arinaga, in Gran Canaria, will host the first prototype of these wind farms. Assembly will begin in the second quarter of 2013, with [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5826,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-5828","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Windar Renovables - The offshore wind farm first tower to be built in Avil\u00e9s<\/title>\n<meta name=\"description\" content=\"La planta de Windar en Avil\u00e9s fabricar\u00e1 la torre del primer parque e\u00f3lico marino (&#039;Offshore&#039;) que se construir\u00e1 en Espa\u00f1a. As\u00ed lo anunci\u00f3 ayer Gamesa en una nota de prensa donde se confirma que el Muelle de Arinaga, en Gran Canaria, acoger\u00e1 el primer prototipo de estos parques e\u00f3licos. Su montaje comenzar\u00e1 en el segundo trimestre de 2013 para completar su instalaci\u00f3n a lo largo del ejercicio, seg\u00fan confirma la multinacional.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Windar Renovables - The offshore wind farm first tower to be built in Avil\u00e9s\" \/>\n<meta property=\"og:description\" content=\"La planta de Windar en Avil\u00e9s fabricar\u00e1 la torre del primer parque e\u00f3lico marino (&#039;Offshore&#039;) que se construir\u00e1 en Espa\u00f1a. As\u00ed lo anunci\u00f3 ayer Gamesa en una nota de prensa donde se confirma que el Muelle de Arinaga, en Gran Canaria, acoger\u00e1 el primer prototipo de estos parques e\u00f3licos. Su montaje comenzar\u00e1 en el segundo trimestre de 2013 para completar su instalaci\u00f3n a lo largo del ejercicio, seg\u00fan confirma la multinacional.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/\" \/>\n<meta property=\"og:site_name\" content=\"Windar Renovables\" \/>\n<meta property=\"article:published_time\" content=\"2012-05-08T14:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-07-05T14:03:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/48_foto_not_08_05_12.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"960\" \/>\n\t<meta property=\"og:image:height\" content=\"370\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"windar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"windar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/\"},\"author\":{\"name\":\"windar\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/49c25732e376ba65693508c33d75f82b\"},\"headline\":\"The offshore wind farm first tower to be built in Avil\u00e9s\",\"datePublished\":\"2012-05-08T14:00:00+00:00\",\"dateModified\":\"2021-07-05T14:03:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/\"},\"wordCount\":286,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/48_foto_not_08_05_12.jpeg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/\",\"url\":\"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/\",\"name\":\"Windar Renovables - The offshore wind farm first tower to be built in Avil\u00e9s\",\"isPartOf\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/48_foto_not_08_05_12.jpeg\",\"datePublished\":\"2012-05-08T14:00:00+00:00\",\"dateModified\":\"2021-07-05T14:03:59+00:00\",\"description\":\"La planta de Windar en Avil\u00e9s fabricar\u00e1 la torre del primer parque e\u00f3lico marino ('Offshore') que se construir\u00e1 en Espa\u00f1a. As\u00ed lo anunci\u00f3 ayer Gamesa en una nota de prensa donde se confirma que el Muelle de Arinaga, en Gran Canaria, acoger\u00e1 el primer prototipo de estos parques e\u00f3licos. Su montaje comenzar\u00e1 en el segundo trimestre de 2013 para completar su instalaci\u00f3n a lo largo del ejercicio, seg\u00fan confirma la multinacional.\",\"breadcrumb\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#primaryimage\",\"url\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/48_foto_not_08_05_12.jpeg\",\"contentUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/48_foto_not_08_05_12.jpeg\",\"width\":960,\"height\":370},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/windar-renovables.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The offshore wind farm first tower to be built in Avil\u00e9s\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#website\",\"url\":\"https:\/\/windar-renovables.com\/en\/\",\"name\":\"Windar Renovables\",\"description\":\"Innovaci\u00f3n para soluciones globales\",\"publisher\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/windar-renovables.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#organization\",\"name\":\"Windar Renovables\",\"url\":\"https:\/\/windar-renovables.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png\",\"contentUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png\",\"width\":1210,\"height\":371,\"caption\":\"Windar Renovables \"},\"image\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/49c25732e376ba65693508c33d75f82b\",\"name\":\"windar\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/1aaf82f5be1e3283e17d94068ee644d4ec0d9dce152ee4591768605a81ff07f6?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1aaf82f5be1e3283e17d94068ee644d4ec0d9dce152ee4591768605a81ff07f6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1aaf82f5be1e3283e17d94068ee644d4ec0d9dce152ee4591768605a81ff07f6?s=96&d=mm&r=g\",\"caption\":\"windar\"},\"sameAs\":[\"https:\/\/windar-renovables.com\"],\"url\":\"https:\/\/windar-renovables.com\/en\/author\/windar\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Windar Renovables - The offshore wind farm first tower to be built in Avil\u00e9s","description":"La planta de Windar en Avil\u00e9s fabricar\u00e1 la torre del primer parque e\u00f3lico marino ('Offshore') que se construir\u00e1 en Espa\u00f1a. As\u00ed lo anunci\u00f3 ayer Gamesa en una nota de prensa donde se confirma que el Muelle de Arinaga, en Gran Canaria, acoger\u00e1 el primer prototipo de estos parques e\u00f3licos. Su montaje comenzar\u00e1 en el segundo trimestre de 2013 para completar su instalaci\u00f3n a lo largo del ejercicio, seg\u00fan confirma la multinacional.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/","og_locale":"en_US","og_type":"article","og_title":"Windar Renovables - The offshore wind farm first tower to be built in Avil\u00e9s","og_description":"La planta de Windar en Avil\u00e9s fabricar\u00e1 la torre del primer parque e\u00f3lico marino ('Offshore') que se construir\u00e1 en Espa\u00f1a. As\u00ed lo anunci\u00f3 ayer Gamesa en una nota de prensa donde se confirma que el Muelle de Arinaga, en Gran Canaria, acoger\u00e1 el primer prototipo de estos parques e\u00f3licos. Su montaje comenzar\u00e1 en el segundo trimestre de 2013 para completar su instalaci\u00f3n a lo largo del ejercicio, seg\u00fan confirma la multinacional.","og_url":"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/","og_site_name":"Windar Renovables","article_published_time":"2012-05-08T14:00:00+00:00","article_modified_time":"2021-07-05T14:03:59+00:00","og_image":[{"width":960,"height":370,"url":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/48_foto_not_08_05_12.jpeg","type":"image\/jpeg"}],"author":"windar","twitter_card":"summary_large_image","twitter_misc":{"Written by":"windar","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#article","isPartOf":{"@id":"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/"},"author":{"name":"windar","@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/49c25732e376ba65693508c33d75f82b"},"headline":"The offshore wind farm first tower to be built in Avil\u00e9s","datePublished":"2012-05-08T14:00:00+00:00","dateModified":"2021-07-05T14:03:59+00:00","mainEntityOfPage":{"@id":"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/"},"wordCount":286,"commentCount":0,"publisher":{"@id":"https:\/\/windar-renovables.com\/en\/#organization"},"image":{"@id":"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#primaryimage"},"thumbnailUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/48_foto_not_08_05_12.jpeg","articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/","url":"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/","name":"Windar Renovables - The offshore wind farm first tower to be built in Avil\u00e9s","isPartOf":{"@id":"https:\/\/windar-renovables.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#primaryimage"},"image":{"@id":"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#primaryimage"},"thumbnailUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/48_foto_not_08_05_12.jpeg","datePublished":"2012-05-08T14:00:00+00:00","dateModified":"2021-07-05T14:03:59+00:00","description":"La planta de Windar en Avil\u00e9s fabricar\u00e1 la torre del primer parque e\u00f3lico marino ('Offshore') que se construir\u00e1 en Espa\u00f1a. As\u00ed lo anunci\u00f3 ayer Gamesa en una nota de prensa donde se confirma que el Muelle de Arinaga, en Gran Canaria, acoger\u00e1 el primer prototipo de estos parques e\u00f3licos. Su montaje comenzar\u00e1 en el segundo trimestre de 2013 para completar su instalaci\u00f3n a lo largo del ejercicio, seg\u00fan confirma la multinacional.","breadcrumb":{"@id":"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#primaryimage","url":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/48_foto_not_08_05_12.jpeg","contentUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/48_foto_not_08_05_12.jpeg","width":960,"height":370},{"@type":"BreadcrumbList","@id":"https:\/\/windar-renovables.com\/en\/the-offshore-wind-farm-first-tower-to-be-built-in-aviles\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/windar-renovables.com\/"},{"@type":"ListItem","position":2,"name":"The offshore wind farm first tower to be built in Avil\u00e9s"}]},{"@type":"WebSite","@id":"https:\/\/windar-renovables.com\/en\/#website","url":"https:\/\/windar-renovables.com\/en\/","name":"Windar Renovables","description":"Innovaci\u00f3n para soluciones globales","publisher":{"@id":"https:\/\/windar-renovables.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/windar-renovables.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/windar-renovables.com\/en\/#organization","name":"Windar Renovables","url":"https:\/\/windar-renovables.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png","contentUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png","width":1210,"height":371,"caption":"Windar Renovables "},"image":{"@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/49c25732e376ba65693508c33d75f82b","name":"windar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1aaf82f5be1e3283e17d94068ee644d4ec0d9dce152ee4591768605a81ff07f6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1aaf82f5be1e3283e17d94068ee644d4ec0d9dce152ee4591768605a81ff07f6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1aaf82f5be1e3283e17d94068ee644d4ec0d9dce152ee4591768605a81ff07f6?s=96&d=mm&r=g","caption":"windar"},"sameAs":["https:\/\/windar-renovables.com"],"url":"https:\/\/windar-renovables.com\/en\/author\/windar\/"}]}},"_links":{"self":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/5828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/comments?post=5828"}],"version-history":[{"count":1,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/5828\/revisions"}],"predecessor-version":[{"id":5829,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/5828\/revisions\/5829"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media\/5826"}],"wp:attachment":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media?parent=5828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/categories?post=5828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/tags?post=5828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}