{"id":5508,"date":"2018-10-08T09:53:00","date_gmt":"2018-10-08T09:53:00","guid":{"rendered":"https:\/\/windar-renovables.com\/last-ten-tps-for-deutsche-bucht-owf-landed-in-germany\/"},"modified":"2021-07-04T09:58:14","modified_gmt":"2021-07-04T09:58:14","slug":"last-ten-tps-for-deutsche-bucht-owf-landed-in-germany","status":"publish","type":"post","link":"https:\/\/windar-renovables.com\/en\/last-ten-tps-for-deutsche-bucht-owf-landed-in-germany\/","title":{"rendered":"Last ten TPs for Deutsche Bucht OWF landed in Germany"},"content":{"rendered":"\n<p>Happy Star BigLift\u00b4s cargo ship has transported the last ten Transition pieces for BeBu offshore wind farm from the port of Aviles in Asturias (Spain) to the Cuxhaven port.&#13;\n&#13;\n<\/p>\n\n<p>Transition pieces for this Project have been fabricated in yards in Spain by the joint venture formed by Grupo Daniel Alonso companies, Windar renovables and Idesa.&#13;\n&#13;\n<\/p>\n\n<p>Windar Project Production Director, Jaime Alfaya and Project Quality Manager, Mario Ordieres have been present in Cuxhaven port to verify the process.&#13;\n&#13;\n<\/p>\n\n<p>This is the second consecutive project that the joint venture has made, after the Merkur OWF project also for Germany, adding in 2018 a total of 66 transition pieces, and demonstrating the capacity of the port of Aviles for these fabrications.&#13;\n&#13;\n<\/p>\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"400\" height=\"300\" src=\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/Debu3.jpeg\" alt=\"\" class=\"wp-image-5506\" srcset=\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/Debu3.jpeg 400w, https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/Debu3-300x225.jpeg 300w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/figure>\n\n<p><strong>WINDAR<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Happy Star BigLift\u00b4s cargo ship has transported the last ten Transition pieces for BeBu offshore wind farm from the port of Aviles in Asturias (Spain) to the Cuxhaven port.&#13; &#13; Transition pieces for this Project have been fabricated in yards in Spain by the joint venture formed by Grupo Daniel Alonso companies, Windar renovables and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5504,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-5508","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/5508","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/comments?post=5508"}],"version-history":[{"count":1,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/5508\/revisions"}],"predecessor-version":[{"id":5509,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/5508\/revisions\/5509"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media\/5504"}],"wp:attachment":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media?parent=5508"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/categories?post=5508"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/tags?post=5508"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}