{"id":5395,"date":"2019-09-16T16:38:00","date_gmt":"2019-09-16T16:38:00","guid":{"rendered":"https:\/\/windar-renovables.com\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/"},"modified":"2021-07-01T16:43:51","modified_gmt":"2021-07-01T16:43:51","slug":"navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations","status":"publish","type":"post","link":"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/","title":{"rendered":"Navantia and Windar will build the French Saint-Brieuc Jacket Foundations"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">On Monday, 16 September, the Spanish Joint Venture formed by Navantia and Windar renovables (Grupo Daniel Aonso) has won a contract to manufacture 62 jacket foundations for the 496MW Saint-Brieuc OWF (France).&#13;\n<\/p>\n\n<p class=\"wp-block-paragraph\">The winner was revealed in Brest, during an event organised by the developer of the project, Ailes Marines, a joint venture between the companies Iberdrola, RES, and Caisse des D\u00e9p\u00f4ts. The event was attended by the presidents of Navantia, Susasa de Sarri\u00e1 and Windar, Orlando Alonso, as well as some representatives of Ailes Marines and other authorities.&#13;\n<\/p>\n\n<p class=\"wp-block-paragraph\">The project with an extension of 78 Km2, will be located in the Bay of Saint Brieuc, 16 km off the french coast and is expected to be operational by 2023.&#13;\n<\/p>\n\n<p class=\"wp-block-paragraph\">The wind farm also will comprise turbines mounted on three-legged jacket foundations designed by Atkins. The manufacturing contract is expected to be signed in February 2020, to begin manufacturing in the summer. This contract will be the most important signed by the JV Navantia-Windar in this market.&#13;\n<\/p>\n\n<p class=\"wp-block-paragraph\">The whole assembly will take place in the Navantia shipyard in Fene (Spain). This contract includes a part of local content, which will be carried out in Brest, such as stabbings, lower nodes and the lattice structure for 34 jackets. The integration of all subsets will be done completely in Fene.&#13;\n<\/p>\n\n<p class=\"wp-block-paragraph\">The foundation components will be assembled by Navantia in Brest in a dedicated area, located at the north of the site. The port of Brest will be also used for temporary storage before foundations are shipped to the site.&#13;\n<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>WINDAR (GRUPO DANIEL ALONSO)<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On Monday, 16 September, the Spanish Joint Venture formed by Navantia and Windar renovables (Grupo Daniel Aonso) has won a contract to manufacture 62 jacket foundations for the 496MW Saint-Brieuc OWF (France).&#13; The winner was revealed in Brest, during an event organised by the developer of the project, Ailes Marines, a joint venture between the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5392,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-5395","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Windar Renovables - Navantia and Windar will build the French Saint-Brieuc Jacket Foundations<\/title>\n<meta name=\"description\" content=\"El lunes 16 de septiembre, la UTE espa\u00f1ola formada por Navantia y Windar renovables (Grupo Daniel Alonso) ha ganado un contrato para fabricar 62 cimentaciones tipo jacket para la OWF de 496MW de Saint-Brieuc (Francia).\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Windar Renovables - Navantia and Windar will build the French Saint-Brieuc Jacket Foundations\" \/>\n<meta property=\"og:description\" content=\"El lunes 16 de septiembre, la UTE espa\u00f1ola formada por Navantia y Windar renovables (Grupo Daniel Alonso) ha ganado un contrato para fabricar 62 cimentaciones tipo jacket para la OWF de 496MW de Saint-Brieuc (Francia).\" \/>\n<meta property=\"og:url\" content=\"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/\" \/>\n<meta property=\"og:site_name\" content=\"Windar Renovables\" \/>\n<meta property=\"article:published_time\" content=\"2019-09-16T16:38:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-07-01T16:43:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/154_brestwindar.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"960\" \/>\n\t<meta property=\"og:image:height\" content=\"370\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"windar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"windar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/\"},\"author\":{\"name\":\"windar\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/49c25732e376ba65693508c33d75f82b\"},\"headline\":\"Navantia and Windar will build the French Saint-Brieuc Jacket Foundations\",\"datePublished\":\"2019-09-16T16:38:00+00:00\",\"dateModified\":\"2021-07-01T16:43:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/\"},\"wordCount\":266,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/154_brestwindar.jpeg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/\",\"url\":\"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/\",\"name\":\"Windar Renovables - Navantia and Windar will build the French Saint-Brieuc Jacket Foundations\",\"isPartOf\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/154_brestwindar.jpeg\",\"datePublished\":\"2019-09-16T16:38:00+00:00\",\"dateModified\":\"2021-07-01T16:43:51+00:00\",\"description\":\"El lunes 16 de septiembre, la UTE espa\u00f1ola formada por Navantia y Windar renovables (Grupo Daniel Alonso) ha ganado un contrato para fabricar 62 cimentaciones tipo jacket para la OWF de 496MW de Saint-Brieuc (Francia).\",\"breadcrumb\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#primaryimage\",\"url\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/154_brestwindar.jpeg\",\"contentUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/154_brestwindar.jpeg\",\"width\":960,\"height\":370,\"caption\":\"brest windar\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/windar-renovables.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Navantia and Windar will build the French Saint-Brieuc Jacket Foundations\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#website\",\"url\":\"https:\/\/windar-renovables.com\/en\/\",\"name\":\"Windar Renovables\",\"description\":\"Innovaci\u00f3n para soluciones globales\",\"publisher\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/windar-renovables.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#organization\",\"name\":\"Windar Renovables\",\"url\":\"https:\/\/windar-renovables.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png\",\"contentUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png\",\"width\":1210,\"height\":371,\"caption\":\"Windar Renovables \"},\"image\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/49c25732e376ba65693508c33d75f82b\",\"name\":\"windar\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/1aaf82f5be1e3283e17d94068ee644d4ec0d9dce152ee4591768605a81ff07f6?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1aaf82f5be1e3283e17d94068ee644d4ec0d9dce152ee4591768605a81ff07f6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1aaf82f5be1e3283e17d94068ee644d4ec0d9dce152ee4591768605a81ff07f6?s=96&d=mm&r=g\",\"caption\":\"windar\"},\"sameAs\":[\"https:\/\/windar-renovables.com\"],\"url\":\"https:\/\/windar-renovables.com\/en\/author\/windar\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Windar Renovables - Navantia and Windar will build the French Saint-Brieuc Jacket Foundations","description":"El lunes 16 de septiembre, la UTE espa\u00f1ola formada por Navantia y Windar renovables (Grupo Daniel Alonso) ha ganado un contrato para fabricar 62 cimentaciones tipo jacket para la OWF de 496MW de Saint-Brieuc (Francia).","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/","og_locale":"en_US","og_type":"article","og_title":"Windar Renovables - Navantia and Windar will build the French Saint-Brieuc Jacket Foundations","og_description":"El lunes 16 de septiembre, la UTE espa\u00f1ola formada por Navantia y Windar renovables (Grupo Daniel Alonso) ha ganado un contrato para fabricar 62 cimentaciones tipo jacket para la OWF de 496MW de Saint-Brieuc (Francia).","og_url":"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/","og_site_name":"Windar Renovables","article_published_time":"2019-09-16T16:38:00+00:00","article_modified_time":"2021-07-01T16:43:51+00:00","og_image":[{"width":960,"height":370,"url":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/154_brestwindar.jpeg","type":"image\/jpeg"}],"author":"windar","twitter_card":"summary_large_image","twitter_misc":{"Written by":"windar","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#article","isPartOf":{"@id":"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/"},"author":{"name":"windar","@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/49c25732e376ba65693508c33d75f82b"},"headline":"Navantia and Windar will build the French Saint-Brieuc Jacket Foundations","datePublished":"2019-09-16T16:38:00+00:00","dateModified":"2021-07-01T16:43:51+00:00","mainEntityOfPage":{"@id":"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/"},"wordCount":266,"commentCount":0,"publisher":{"@id":"https:\/\/windar-renovables.com\/en\/#organization"},"image":{"@id":"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#primaryimage"},"thumbnailUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/154_brestwindar.jpeg","articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/","url":"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/","name":"Windar Renovables - Navantia and Windar will build the French Saint-Brieuc Jacket Foundations","isPartOf":{"@id":"https:\/\/windar-renovables.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#primaryimage"},"image":{"@id":"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#primaryimage"},"thumbnailUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/154_brestwindar.jpeg","datePublished":"2019-09-16T16:38:00+00:00","dateModified":"2021-07-01T16:43:51+00:00","description":"El lunes 16 de septiembre, la UTE espa\u00f1ola formada por Navantia y Windar renovables (Grupo Daniel Alonso) ha ganado un contrato para fabricar 62 cimentaciones tipo jacket para la OWF de 496MW de Saint-Brieuc (Francia).","breadcrumb":{"@id":"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#primaryimage","url":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/154_brestwindar.jpeg","contentUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/154_brestwindar.jpeg","width":960,"height":370,"caption":"brest windar"},{"@type":"BreadcrumbList","@id":"https:\/\/windar-renovables.com\/en\/navantia-and-windar-will-build-the-french-saint-brieuc-jacket-foundations\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/windar-renovables.com\/"},{"@type":"ListItem","position":2,"name":"Navantia and Windar will build the French Saint-Brieuc Jacket Foundations"}]},{"@type":"WebSite","@id":"https:\/\/windar-renovables.com\/en\/#website","url":"https:\/\/windar-renovables.com\/en\/","name":"Windar Renovables","description":"Innovaci\u00f3n para soluciones globales","publisher":{"@id":"https:\/\/windar-renovables.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/windar-renovables.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/windar-renovables.com\/en\/#organization","name":"Windar Renovables","url":"https:\/\/windar-renovables.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png","contentUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png","width":1210,"height":371,"caption":"Windar Renovables "},"image":{"@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/49c25732e376ba65693508c33d75f82b","name":"windar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1aaf82f5be1e3283e17d94068ee644d4ec0d9dce152ee4591768605a81ff07f6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1aaf82f5be1e3283e17d94068ee644d4ec0d9dce152ee4591768605a81ff07f6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1aaf82f5be1e3283e17d94068ee644d4ec0d9dce152ee4591768605a81ff07f6?s=96&d=mm&r=g","caption":"windar"},"sameAs":["https:\/\/windar-renovables.com"],"url":"https:\/\/windar-renovables.com\/en\/author\/windar\/"}]}},"_links":{"self":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/5395","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/comments?post=5395"}],"version-history":[{"count":1,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/5395\/revisions"}],"predecessor-version":[{"id":5396,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/5395\/revisions\/5396"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media\/5392"}],"wp:attachment":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media?parent=5395"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/categories?post=5395"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/tags?post=5395"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}