{"id":23195,"date":"2026-03-17T11:46:36","date_gmt":"2026-03-17T11:46:36","guid":{"rendered":"https:\/\/windar-renovables.com\/?p=23195"},"modified":"2026-03-17T11:46:36","modified_gmt":"2026-03-17T11:46:36","slug":"windar-renovables-to-build-second-wind-turbine-tower-manufacturing-facility-at-ctpark-legnica","status":"publish","type":"post","link":"https:\/\/windar-renovables.com\/en\/windar-renovables-to-build-second-wind-turbine-tower-manufacturing-facility-at-ctpark-legnica\/","title":{"rendered":"Windar Renovables to build second wind turbine tower manufacturing facility at CTPark Legnica"},"content":{"rendered":"<p>Windar Renovables has announced the development of its second production facility in Poland with the construction of a new onshore wind turbine tower manufacturing plant at CTPark Legnica.<\/p>\n<p>The project includes the lease of nearly 29,000 sqm of industrial and warehouse space, supported by an outdoor storage yard of almost 41,000 sqm, designed to strengthen its manufacturing capabilities. Production is scheduled to begin in the fourth quarter of 2026.<\/p>\n<p>Once fully operational, the facility will be capable of manufacturing up to 200 onshore wind turbine towers annually, equivalent to more than 1,000 MW of clean energy fed into the grid. The plant will primarily serve the Polish and German markets, responding to the growing demand for wind energy infrastructure across Central Europe.<\/p>\n<p>The facility will include four production halls, a raw materials warehouse, an outdoor storage area, and an office module. The production lines will enable manufacturing of tower sections up to 40 meters in length, weighing up to 80 tons, and with a diameter of up to 6.5 meters.<\/p>\n<p>As <strong>Pelayo Berjano, CEO of Windar Polska<\/strong>, emphasizes: \u201cPoland is clearly a key logistics hub for supplying wind turbine components across the Central European market and a cornerstone of Windar\u2019s growth roadmap. Against a challenging global backdrop, expanding manufacturing capacity within Europe remains a priority for our company. We welcome our collaboration with CTPark Legnica in delivering this new facility.\u201d<\/p>\n<p>\u201cThe project for Windar Onshore aligns with CTP\u2019s strategy of developing advanced industrial ecosystems that go beyond the scope of standard warehouse facilities. The Legnica development requires the delivery of a highly complex building, featuring uniquely specified production halls and extensive storage infrastructure. The project is built on two pillars \u2013 the park\u2019s strategic location, which facilitates expansion toward the German market, and mutual trust. A partnership\u2011driven approach and a deep understanding of heavy manufacturing allowed us to design infrastructure that will become a vital link in the European renewable energy supply chain,\u201d explains <strong>Krzysztof Moryson, Head of Construction at CTP Poland.<\/strong><\/p>\n<p>The investment will also serve as an important driver of economic growth in the region, creating up to 300 new jobs and engaging local suppliers. CTPark Legnica, where the Windar factory will be opened, is being developed within the Legnica Special Economic Zone \u2013 one of the key institutions supporting investment and entrepreneurship in southwestern Poland.<\/p>\n<p>\u201cThe project delivered for Windar Onshore was among the most demanding processes in the industrial real estate segment. It required tailoring the designed facility to the specifics of heavy manufacturing and the technological parameters associated with producing large-scale components for the wind energy sector. At the same time, it was an investment with a distinctly international character \u2013 both in terms of the investor\u2019s ownership structure and the target markets served by the plant. We are pleased to have supported Windar Onshore in a process that marks another step in the company\u2019s expansion in Europe and simultaneously strengthens Poland\u2019s position as an important link in the European supply chain for the renewable energy industry,\u201d says <strong>Igor Roguski, Partner at SQM Advisory<\/strong>.<\/p>\n<p>\u201cIn projects of this kind, it is crucial to precisely tailor the infrastructure to the specifics of the production process and the tenant\u2019s development plans. The Legnica project aligns with CTP\u2019s consistent expansion of its portfolio in Poland with advanced industrial and warehousing facilities, enabling tenants to increase their production capacity, grow within the same location, and plan their long-term presence in the region,\u201d explains <strong>Sandra Winiarska, Senior Business Developer at CTP Poland.<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>About WINDAR RENOVABLES:<\/strong><\/p>\n<p>Windar Renovables is a global leader in the clean and sustainable energy sector through the manufacturing of towers for both onshore and offshore wind farms as well as foundations for the offshore wind industry. Led by its founding team, Windar operates a network of strategically located manufacturing facilities serving the world\u2019s largest wind markets, with production manufacturing in Spain (Asturias, Galicia, and Andalucia), India, Brazil, Mexico and Poland. Its ability to deliver tailored, high-quality solutions with a strong focus on innovation and sustainability has earned the trust of major players in the renewable sector, reflected in a robust pipeline of future projects. More information is available at: www.windar-renovables.com<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Windar Renovables has announced the development of its second production facility in Poland with the construction of a new onshore wind turbine tower manufacturing plant at CTPark Legnica. The project includes the lease of nearly 29,000 sqm of industrial and warehouse space, supported by an outdoor storage yard of almost 41,000 sqm, designed to strengthen [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":23196,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[18],"tags":[],"class_list":["post-23195","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"_links":{"self":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/23195","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/comments?post=23195"}],"version-history":[{"count":1,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/23195\/revisions"}],"predecessor-version":[{"id":23198,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/23195\/revisions\/23198"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media\/23196"}],"wp:attachment":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media?parent=23195"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/categories?post=23195"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/tags?post=23195"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}