{"id":22034,"date":"2024-10-16T08:35:33","date_gmt":"2024-10-16T08:35:33","guid":{"rendered":"https:\/\/windar-renovables.com\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/"},"modified":"2024-10-16T09:37:55","modified_gmt":"2024-10-16T09:37:55","slug":"windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias","status":"publish","type":"post","link":"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/","title":{"rendered":"Windar Renovables starts adaptation works on new monopile factory in Avil\u00e9s, Asturias"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Plant investment amounts to 130 million and will create 600 jobs in the region, where the firm specialised in the offshore wind sector already has five other production centres in operation.<\/p>\n\n<p class=\"wp-block-paragraph\">Windar Renovables has recently started adaptation work on the land it acquired last March on the right bank of the Avil\u00e9s estuary in Asturias.<\/p>\n\n<p class=\"wp-block-paragraph\">Once the work is completed, Windar will invest more than 130 million euros, which will be used to adapt a large part of the existing buildings, as well as to build new facilities, already adapted to the manufacture of monopiles for new generation wind turbines, which have an installed capacity of more than 15 MW.<\/p>\n\n<p class=\"wp-block-paragraph\">To accomplish this milestone, the multinational will install several production lines with the capacity to manufacture monopiles of up to 12.5 metres in diameter, 3,500 tonnes and 130 metres in length. The factory will have an annual capacity of between 100 and 120 monopiles, whose potential destination will be mainly wind farms to be installed in the North and Baltic Seas, as well as the East Coast of the United States. <\/p>\n\n<p class=\"wp-block-paragraph\">Windar has already set out to dismantle existing equipment and is expediting demolition and construction permits, with the aim of having the new factory ready to start monopile production in 2027.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>WINDAR RENOVABLES<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Plant investment amounts to 130 million and will create 600 jobs in the region, where the firm specialised in the offshore wind sector already has five other production centres in operation. Windar Renovables has recently started adaptation work on the land it acquired last March on the right bank of the Avil\u00e9s estuary in Asturias. [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":22031,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26,27],"tags":[],"class_list":["post-22034","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Windar Renovables starts adaptation works on new monopile factory in Avil\u00e9s, Asturias - Windar Renovables<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Windar Renovables starts adaptation works on new monopile factory in Avil\u00e9s, Asturias - Windar Renovables\" \/>\n<meta property=\"og:description\" content=\"Plant investment amounts to 130 million and will create 600 jobs in the region, where the firm specialised in the offshore wind sector already has five other production centres in operation. Windar Renovables has recently started adaptation work on the land it acquired last March on the right bank of the Avil\u00e9s estuary in Asturias. [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/\" \/>\n<meta property=\"og:site_name\" content=\"Windar Renovables\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-16T08:35:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-16T09:37:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2024\/10\/Infografia-Inversion-MPs-Windar-Aviles-scaled-e1729067700277.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"windarrenovables\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"windarrenovables\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/\"},\"author\":{\"name\":\"windarrenovables\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/0a1d39c701b62901cabece7c1e303265\"},\"headline\":\"Windar Renovables starts adaptation works on new monopile factory in Avil\u00e9s, Asturias\",\"datePublished\":\"2024-10-16T08:35:33+00:00\",\"dateModified\":\"2024-10-16T09:37:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/\"},\"wordCount\":218,\"publisher\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2024\/10\/Infografia-Inversion-MPs-Windar-Aviles-scaled-e1729067700277.jpg\",\"articleSection\":[\"News\",\"Press\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/\",\"url\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/\",\"name\":\"Windar Renovables starts adaptation works on new monopile factory in Avil\u00e9s, Asturias - Windar Renovables\",\"isPartOf\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2024\/10\/Infografia-Inversion-MPs-Windar-Aviles-scaled-e1729067700277.jpg\",\"datePublished\":\"2024-10-16T08:35:33+00:00\",\"dateModified\":\"2024-10-16T09:37:55+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/#primaryimage\",\"url\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2024\/10\/Infografia-Inversion-MPs-Windar-Aviles-scaled-e1729067700277.jpg\",\"contentUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2024\/10\/Infografia-Inversion-MPs-Windar-Aviles-scaled-e1729067700277.jpg\",\"width\":1670,\"height\":1197},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/windar-renovables.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Windar Renovables starts adaptation works on new monopile factory in Avil\u00e9s, Asturias\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#website\",\"url\":\"https:\/\/windar-renovables.com\/en\/\",\"name\":\"Windar Renovables\",\"description\":\"Innovaci\u00f3n para soluciones globales\",\"publisher\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/windar-renovables.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#organization\",\"name\":\"Windar Renovables\",\"url\":\"https:\/\/windar-renovables.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png\",\"contentUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png\",\"width\":1210,\"height\":371,\"caption\":\"Windar Renovables \"},\"image\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/0a1d39c701b62901cabece7c1e303265\",\"name\":\"windarrenovables\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/04f00333672fbb153112b92577a067d0a89611411a8835b6571e2cc4dba92f8d?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/04f00333672fbb153112b92577a067d0a89611411a8835b6571e2cc4dba92f8d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/04f00333672fbb153112b92577a067d0a89611411a8835b6571e2cc4dba92f8d?s=96&d=mm&r=g\",\"caption\":\"windarrenovables\"},\"url\":\"https:\/\/windar-renovables.com\/en\/author\/windarrenovables\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Windar Renovables starts adaptation works on new monopile factory in Avil\u00e9s, Asturias - Windar Renovables","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/","og_locale":"en_US","og_type":"article","og_title":"Windar Renovables starts adaptation works on new monopile factory in Avil\u00e9s, Asturias - Windar Renovables","og_description":"Plant investment amounts to 130 million and will create 600 jobs in the region, where the firm specialised in the offshore wind sector already has five other production centres in operation. Windar Renovables has recently started adaptation work on the land it acquired last March on the right bank of the Avil\u00e9s estuary in Asturias. [&hellip;]","og_url":"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/","og_site_name":"Windar Renovables","article_published_time":"2024-10-16T08:35:33+00:00","article_modified_time":"2024-10-16T09:37:55+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2024\/10\/Infografia-Inversion-MPs-Windar-Aviles-scaled-e1729067700277.jpg","type":"image\/jpeg"}],"author":"windarrenovables","twitter_card":"summary_large_image","twitter_misc":{"Written by":"windarrenovables","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/#article","isPartOf":{"@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/"},"author":{"name":"windarrenovables","@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/0a1d39c701b62901cabece7c1e303265"},"headline":"Windar Renovables starts adaptation works on new monopile factory in Avil\u00e9s, Asturias","datePublished":"2024-10-16T08:35:33+00:00","dateModified":"2024-10-16T09:37:55+00:00","mainEntityOfPage":{"@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/"},"wordCount":218,"publisher":{"@id":"https:\/\/windar-renovables.com\/en\/#organization"},"image":{"@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/#primaryimage"},"thumbnailUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2024\/10\/Infografia-Inversion-MPs-Windar-Aviles-scaled-e1729067700277.jpg","articleSection":["News","Press"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/","url":"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/","name":"Windar Renovables starts adaptation works on new monopile factory in Avil\u00e9s, Asturias - Windar Renovables","isPartOf":{"@id":"https:\/\/windar-renovables.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/#primaryimage"},"image":{"@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/#primaryimage"},"thumbnailUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2024\/10\/Infografia-Inversion-MPs-Windar-Aviles-scaled-e1729067700277.jpg","datePublished":"2024-10-16T08:35:33+00:00","dateModified":"2024-10-16T09:37:55+00:00","breadcrumb":{"@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/#primaryimage","url":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2024\/10\/Infografia-Inversion-MPs-Windar-Aviles-scaled-e1729067700277.jpg","contentUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2024\/10\/Infografia-Inversion-MPs-Windar-Aviles-scaled-e1729067700277.jpg","width":1670,"height":1197},{"@type":"BreadcrumbList","@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-starts-adaptation-works-on-new-monopile-factory-in-aviles-asturias\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/windar-renovables.com\/"},{"@type":"ListItem","position":2,"name":"Windar Renovables starts adaptation works on new monopile factory in Avil\u00e9s, Asturias"}]},{"@type":"WebSite","@id":"https:\/\/windar-renovables.com\/en\/#website","url":"https:\/\/windar-renovables.com\/en\/","name":"Windar Renovables","description":"Innovaci\u00f3n para soluciones globales","publisher":{"@id":"https:\/\/windar-renovables.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/windar-renovables.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/windar-renovables.com\/en\/#organization","name":"Windar Renovables","url":"https:\/\/windar-renovables.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png","contentUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png","width":1210,"height":371,"caption":"Windar Renovables "},"image":{"@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/0a1d39c701b62901cabece7c1e303265","name":"windarrenovables","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/04f00333672fbb153112b92577a067d0a89611411a8835b6571e2cc4dba92f8d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/04f00333672fbb153112b92577a067d0a89611411a8835b6571e2cc4dba92f8d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/04f00333672fbb153112b92577a067d0a89611411a8835b6571e2cc4dba92f8d?s=96&d=mm&r=g","caption":"windarrenovables"},"url":"https:\/\/windar-renovables.com\/en\/author\/windarrenovables\/"}]}},"_links":{"self":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/22034","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/comments?post=22034"}],"version-history":[{"count":1,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/22034\/revisions"}],"predecessor-version":[{"id":22035,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/22034\/revisions\/22035"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media\/22031"}],"wp:attachment":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media?parent=22034"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/categories?post=22034"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/tags?post=22034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}