{"id":19576,"date":"2023-11-14T08:25:16","date_gmt":"2023-11-14T08:25:16","guid":{"rendered":"https:\/\/windar-renovables.com\/fecamp-project-reaches-its-completion-with-the-last-shipment-of-the-last-3-offshore-towers\/"},"modified":"2023-11-17T09:03:27","modified_gmt":"2023-11-17T09:03:27","slug":"fecamp-project-reaches-its-completion-with-the-last-shipment-of-the-last-3-offshore-towers","status":"publish","type":"post","link":"https:\/\/windar-renovables.com\/en\/fecamp-project-reaches-its-completion-with-the-last-shipment-of-the-last-3-offshore-towers\/","title":{"rendered":"F\u00e9camp project reaches its completion with the last shipment of the last 3 offshore towers"},"content":{"rendered":"\n<p>Yesterday marked the last shipment of our tower sections belonging to the 35 turbines for the offshore wind farm &#8220;Parc \u00e9olien en mer de F\u00e9camp&#8221; that we manufactured in our Avil\u00e9s facilities and that will be located between 13 and 24 km off the coast of Normandy.<\/p>\n\n<p>The moment of shipment is probably one of the most critical and crucial, when the pieces leave our facilities for their final destination for their journey to being.&#13;\nThis represents the culmination of a rigorous and careful project that involves a committed team that drive each project forward.<\/p>\n\n<p>F\u00e9camp will produce electricity for some 770,000 households. It will contribute to the French target of 40% renewable energy by 2030. The completion of this project marks another major milestone for Windar Renovables and a step towards a sustainable transformation of the energy sector.<\/p>\n\n<p>We remain committed to our sustainability strategy that outlines our long-term goals for combating climate change and its effects.<\/p>\n\n<p><strong>WINDAR RENOVABLES<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Yesterday marked the last shipment of our tower sections belonging to the 35 turbines for the offshore wind farm &#8220;Parc \u00e9olien en mer de F\u00e9camp&#8221; that we manufactured in our Avil\u00e9s facilities and that will be located between 13 and 24 km off the coast of Normandy. The moment of shipment is probably one of [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":19573,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26,27],"tags":[],"class_list":["post-19576","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press"],"_links":{"self":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/19576","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/comments?post=19576"}],"version-history":[{"count":1,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/19576\/revisions"}],"predecessor-version":[{"id":19577,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/19576\/revisions\/19577"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media\/19573"}],"wp:attachment":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media?parent=19576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/categories?post=19576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/tags?post=19576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}