{"id":19468,"date":"2023-09-06T07:19:19","date_gmt":"2023-09-06T07:19:19","guid":{"rendered":"https:\/\/windar-renovables.com\/saint-brieuc-offshore-wind-farm-in-france-continues-supplying-green-energy-to-the-french-brittany\/"},"modified":"2023-09-19T07:52:20","modified_gmt":"2023-09-19T07:52:20","slug":"saint-brieuc-offshore-wind-farm-in-france-continues-supplying-green-energy-to-the-french-brittany","status":"publish","type":"post","link":"https:\/\/windar-renovables.com\/en\/saint-brieuc-offshore-wind-farm-in-france-continues-supplying-green-energy-to-the-french-brittany\/","title":{"rendered":"Saint-Brieuc offshore wind farm in France continues supplying green energy to the French Brittany"},"content":{"rendered":"\n<p>It is the first large-scale offshore wind project of our client Iberdrola in Brittany.<\/p>\n\n<p>The wind farm will produce about 1,820 GWh\/year, which corresponds to the annual electricity of 835,000 people <\/p>\n\n<p>51 of the 62 jackets Windar Renovables has manufactured and 35 of the 62 turbines have already been installed.<\/p>\n\n<p>Each of these pieces weighs 1,150 tonnes, is 75 metres high and 25 metres wide and has been manufactured by the business alliance Navantia Seanergies and Windar Renovables at the Fene shipyard.<\/p>\n\n<p><\/p>\n\n<p><strong>Windar Renovables<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>It is the first large-scale offshore wind project of our client Iberdrola in Brittany. The wind farm will produce about 1,820 GWh\/year, which corresponds to the annual electricity of 835,000 people 51 of the 62 jackets Windar Renovables has manufactured and 35 of the 62 turbines have already been installed. Each of these pieces weighs [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":19453,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26,27],"tags":[],"class_list":["post-19468","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press"],"_links":{"self":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/19468","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/comments?post=19468"}],"version-history":[{"count":1,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/19468\/revisions"}],"predecessor-version":[{"id":19469,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/19468\/revisions\/19469"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media\/19453"}],"wp:attachment":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media?parent=19468"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/categories?post=19468"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/tags?post=19468"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}