{"id":19466,"date":"2023-09-13T07:15:24","date_gmt":"2023-09-13T07:15:24","guid":{"rendered":"https:\/\/windar-renovables.com\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/"},"modified":"2023-09-19T07:50:26","modified_gmt":"2023-09-19T07:50:26","slug":"windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm","status":"publish","type":"post","link":"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/","title":{"rendered":"Windar Renovables has restarted the installation of the 50 transition pieces for the Baltic Eagle offshore wind farm."},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Each of these components is 15 metres high, 6.5 metres in diameter and weighs 240 tonnes, which are currently stored in the port of Mukran.<\/p>\n\n<p class=\"wp-block-paragraph\">Around 800 new jobs have been created during the manufacture of these structures and some 30 suppliers from the north of Spain have been involved.<\/p>\n\n<p class=\"wp-block-paragraph\">With a total capacity of 476MW:<\/p>\n\n<p class=\"wp-block-paragraph\">\u2705 Baltic Eagle will comprise 50 wind turbines&#13;\n\u2705 Enough to meet the demand of 475,000 households and supply clean energy&#13;\n\u2705 Avoid the emission of almost 1M CO2 tn\/annually.<\/p>\n\n<p class=\"wp-block-paragraph\">This is the second offshore wind farm promoted by\u00a0Iberdrola\u00a0in Germany after the commissioning of the Wikinger offshore wind farm (350 MW) for which Windar previously manufactured 29 jacket substructures and is developing the 300 MW &#8220;Windanker&#8221; project (21 TPs), to be completed in 2026.<\/p>\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n<p class=\"wp-block-paragraph\"><strong>Windar Renovables<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Each of these components is 15 metres high, 6.5 metres in diameter and weighs 240 tonnes, which are currently stored in the port of Mukran. Around 800 new jobs have been created during the manufacture of these structures and some 30 suppliers from the north of Spain have been involved. With a total capacity of [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":19448,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26,27],"tags":[],"class_list":["post-19466","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Windar Renovables has restarted the installation of the 50 transition pieces for the Baltic Eagle offshore wind farm. - Windar Renovables<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Windar Renovables has restarted the installation of the 50 transition pieces for the Baltic Eagle offshore wind farm. - Windar Renovables\" \/>\n<meta property=\"og:description\" content=\"Each of these components is 15 metres high, 6.5 metres in diameter and weighs 240 tonnes, which are currently stored in the port of Mukran. Around 800 new jobs have been created during the manufacture of these structures and some 30 suppliers from the north of Spain have been involved. With a total capacity of [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/\" \/>\n<meta property=\"og:site_name\" content=\"Windar Renovables\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-13T07:15:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-09-19T07:50:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2023\/09\/BAE22-48-02-scaled.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"953\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"windarrenovables\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"windarrenovables\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/\"},\"author\":{\"name\":\"windarrenovables\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/0a1d39c701b62901cabece7c1e303265\"},\"headline\":\"Windar Renovables has restarted the installation of the 50 transition pieces for the Baltic Eagle offshore wind farm.\",\"datePublished\":\"2023-09-13T07:15:24+00:00\",\"dateModified\":\"2023-09-19T07:50:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/\"},\"wordCount\":137,\"publisher\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2023\/09\/BAE22-48-02-scaled.jpeg\",\"articleSection\":[\"News\",\"Press\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/\",\"url\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/\",\"name\":\"Windar Renovables has restarted the installation of the 50 transition pieces for the Baltic Eagle offshore wind farm. - Windar Renovables\",\"isPartOf\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2023\/09\/BAE22-48-02-scaled.jpeg\",\"datePublished\":\"2023-09-13T07:15:24+00:00\",\"dateModified\":\"2023-09-19T07:50:26+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/#primaryimage\",\"url\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2023\/09\/BAE22-48-02-scaled.jpeg\",\"contentUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2023\/09\/BAE22-48-02-scaled.jpeg\",\"width\":2560,\"height\":953},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/windar-renovables.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Windar Renovables has restarted the installation of the 50 transition pieces for the Baltic Eagle offshore wind farm.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#website\",\"url\":\"https:\/\/windar-renovables.com\/en\/\",\"name\":\"Windar Renovables\",\"description\":\"Innovaci\u00f3n para soluciones globales\",\"publisher\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/windar-renovables.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#organization\",\"name\":\"Windar Renovables\",\"url\":\"https:\/\/windar-renovables.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png\",\"contentUrl\":\"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png\",\"width\":1210,\"height\":371,\"caption\":\"Windar Renovables \"},\"image\":{\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/0a1d39c701b62901cabece7c1e303265\",\"name\":\"windarrenovables\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/04f00333672fbb153112b92577a067d0a89611411a8835b6571e2cc4dba92f8d?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/04f00333672fbb153112b92577a067d0a89611411a8835b6571e2cc4dba92f8d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/04f00333672fbb153112b92577a067d0a89611411a8835b6571e2cc4dba92f8d?s=96&d=mm&r=g\",\"caption\":\"windarrenovables\"},\"url\":\"https:\/\/windar-renovables.com\/en\/author\/windarrenovables\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Windar Renovables has restarted the installation of the 50 transition pieces for the Baltic Eagle offshore wind farm. - Windar Renovables","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/","og_locale":"en_US","og_type":"article","og_title":"Windar Renovables has restarted the installation of the 50 transition pieces for the Baltic Eagle offshore wind farm. - Windar Renovables","og_description":"Each of these components is 15 metres high, 6.5 metres in diameter and weighs 240 tonnes, which are currently stored in the port of Mukran. Around 800 new jobs have been created during the manufacture of these structures and some 30 suppliers from the north of Spain have been involved. With a total capacity of [&hellip;]","og_url":"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/","og_site_name":"Windar Renovables","article_published_time":"2023-09-13T07:15:24+00:00","article_modified_time":"2023-09-19T07:50:26+00:00","og_image":[{"width":2560,"height":953,"url":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2023\/09\/BAE22-48-02-scaled.jpeg","type":"image\/jpeg"}],"author":"windarrenovables","twitter_card":"summary_large_image","twitter_misc":{"Written by":"windarrenovables","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/#article","isPartOf":{"@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/"},"author":{"name":"windarrenovables","@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/0a1d39c701b62901cabece7c1e303265"},"headline":"Windar Renovables has restarted the installation of the 50 transition pieces for the Baltic Eagle offshore wind farm.","datePublished":"2023-09-13T07:15:24+00:00","dateModified":"2023-09-19T07:50:26+00:00","mainEntityOfPage":{"@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/"},"wordCount":137,"publisher":{"@id":"https:\/\/windar-renovables.com\/en\/#organization"},"image":{"@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/#primaryimage"},"thumbnailUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2023\/09\/BAE22-48-02-scaled.jpeg","articleSection":["News","Press"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/","url":"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/","name":"Windar Renovables has restarted the installation of the 50 transition pieces for the Baltic Eagle offshore wind farm. - Windar Renovables","isPartOf":{"@id":"https:\/\/windar-renovables.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/#primaryimage"},"image":{"@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/#primaryimage"},"thumbnailUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2023\/09\/BAE22-48-02-scaled.jpeg","datePublished":"2023-09-13T07:15:24+00:00","dateModified":"2023-09-19T07:50:26+00:00","breadcrumb":{"@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/#primaryimage","url":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2023\/09\/BAE22-48-02-scaled.jpeg","contentUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2023\/09\/BAE22-48-02-scaled.jpeg","width":2560,"height":953},{"@type":"BreadcrumbList","@id":"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/windar-renovables.com\/"},{"@type":"ListItem","position":2,"name":"Windar Renovables has restarted the installation of the 50 transition pieces for the Baltic Eagle offshore wind farm."}]},{"@type":"WebSite","@id":"https:\/\/windar-renovables.com\/en\/#website","url":"https:\/\/windar-renovables.com\/en\/","name":"Windar Renovables","description":"Innovaci\u00f3n para soluciones globales","publisher":{"@id":"https:\/\/windar-renovables.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/windar-renovables.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/windar-renovables.com\/en\/#organization","name":"Windar Renovables","url":"https:\/\/windar-renovables.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png","contentUrl":"https:\/\/windar-renovables.com\/wp-content\/uploads\/2021\/07\/cropped-Mesa-de-trabajo-1.png","width":1210,"height":371,"caption":"Windar Renovables "},"image":{"@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/windar-renovables.com\/en\/#\/schema\/person\/0a1d39c701b62901cabece7c1e303265","name":"windarrenovables","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/04f00333672fbb153112b92577a067d0a89611411a8835b6571e2cc4dba92f8d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/04f00333672fbb153112b92577a067d0a89611411a8835b6571e2cc4dba92f8d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/04f00333672fbb153112b92577a067d0a89611411a8835b6571e2cc4dba92f8d?s=96&d=mm&r=g","caption":"windarrenovables"},"url":"https:\/\/windar-renovables.com\/en\/author\/windarrenovables\/"}]}},"_links":{"self":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/19466","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/comments?post=19466"}],"version-history":[{"count":1,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/19466\/revisions"}],"predecessor-version":[{"id":19467,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/19466\/revisions\/19467"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media\/19448"}],"wp:attachment":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media?parent=19466"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/categories?post=19466"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/tags?post=19466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}