{"id":19466,"date":"2023-09-13T07:15:24","date_gmt":"2023-09-13T07:15:24","guid":{"rendered":"https:\/\/windar-renovables.com\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/"},"modified":"2023-09-19T07:50:26","modified_gmt":"2023-09-19T07:50:26","slug":"windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm","status":"publish","type":"post","link":"https:\/\/windar-renovables.com\/en\/windar-renovables-has-restarted-the-installation-of-the-50-transition-pieces-for-the-baltic-eagle-offshore-wind-farm\/","title":{"rendered":"Windar Renovables has restarted the installation of the 50 transition pieces for the Baltic Eagle offshore wind farm."},"content":{"rendered":"\n<p>Each of these components is 15 metres high, 6.5 metres in diameter and weighs 240 tonnes, which are currently stored in the port of Mukran.<\/p>\n\n<p>Around 800 new jobs have been created during the manufacture of these structures and some 30 suppliers from the north of Spain have been involved.<\/p>\n\n<p>With a total capacity of 476MW:<\/p>\n\n<p>\u2705 Baltic Eagle will comprise 50 wind turbines&#13;\n\u2705 Enough to meet the demand of 475,000 households and supply clean energy&#13;\n\u2705 Avoid the emission of almost 1M CO2 tn\/annually.<\/p>\n\n<p>This is the second offshore wind farm promoted by\u00a0Iberdrola\u00a0in Germany after the commissioning of the Wikinger offshore wind farm (350 MW) for which Windar previously manufactured 29 jacket substructures and is developing the 300 MW &#8220;Windanker&#8221; project (21 TPs), to be completed in 2026.<\/p>\n\n<p><\/p>\n\n<p><strong>Windar Renovables<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Each of these components is 15 metres high, 6.5 metres in diameter and weighs 240 tonnes, which are currently stored in the port of Mukran. Around 800 new jobs have been created during the manufacture of these structures and some 30 suppliers from the north of Spain have been involved. With a total capacity of [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":19448,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26,27],"tags":[],"class_list":["post-19466","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press"],"_links":{"self":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/19466","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/comments?post=19466"}],"version-history":[{"count":1,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/19466\/revisions"}],"predecessor-version":[{"id":19467,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/posts\/19466\/revisions\/19467"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media\/19448"}],"wp:attachment":[{"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/media?parent=19466"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/categories?post=19466"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/windar-renovables.com\/en\/wp-json\/wp\/v2\/tags?post=19466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}